About This Project
Both buildings added new high efficiency boilers, and needed a custom flue solution. Together with Metal-Fab we designed the layout and properly sized the stack. We used Metal-Fab Corr-Guard material; it has an AL29-4C liner with 430 SS outer. We used 1" ceramic insulation on the exterior of the building.